The construction industry continues to provide us with a challenging and changing working environment. We also face the real life issues arising out of the scarcity of technical and professional resources. Options 4 Training provides solutions for developing personnel and project teams.
Coaching & Training: Options 4 Training
Introduction
Surgery Coaching
Option 1
-
Targeted Coaching for specific issues or projects.
-
Delivered by a facilitator to either an individual or a small group (up to around 5 delegates).
-
Surgery Coaching is usually delivered with no or very little preparation by the Coach, however, real life issues are resolved at the time.
-
The Surgery will ordinarily range from 2 to 8 hours dependent on the Client’s requirements and it ensures the delegates are coached at a detailed level.
Typical Subject Matters
-
Drafting Letters.
-
Contractual Advice.
-
Preparing Variations or Compensation Events.
-
Preparing or Amending Programmes.
-
Clarification of Contractual Mechanisms.
Formal Training
Option 2
-
Targeted at providing a general understanding on a relatively broad subject.
-
Delivered by 2 facilitators to a maximum audience of 25 delegates.
-
Formal Seminars are delivered with PowerPoint slides and other technical handouts.
-
The Seminar will usually range from 0.5 days to 2 full days dependent on the Client’s requirements and the extent of the subject matter.
Typical Subject Matters
-
Commercial Awareness Training.
-
JCT 2011 and 2016 Traditional and Design & Build Forms of Contract.
-
NEC3/4 Options A and C Forms of Contract.
-
Delay Analysis Techniques.
Workshop Coaching
Option 3
-
Targeted at key business critical technical areas with Coaching to provide an intermediate level of technical competence.
-
Delivered by 2 facilitators to a maximum audience of 25 delegates split into sub-teams of 3 to 5 delegates.
-
A mixture of PowerPoint slides covering the general understanding and Case Study Workshops is a very effective means for delivery.
-
Workshop Coaching will ordinarily range from a single day to 2 days dependent on the extent and depth of the technical content.
Typical Subject Matters
-
Commercial Awareness Training.
-
JCT 2011 and 2016 Traditional and Design & Build Forms of Contract.
-
NEC3/4 Options A and C Forms of Contract.
-
Delay Analysis Techniques.
Case Study Coaching
Option 4
-
Targeted at key business critical technical areas with Coaching to provide a high level of technical competence.
-
Delivered by 2 or more facilitators to a maximum audience of 25 delegates split into sub-teams of 3 to 5 delegates.
-
The Case Studies are an effective means to meet our Client’s precise business requirements supported with a few selected PowerPoint slides and handouts.
-
Case Study Coaching will ordinarily range from a single day to 2 days dependent on the extent and depth of the technical content.
Typical Subject Matters
-
Commercial Awareness Training.
-
JCT 2011 and 2016 Traditional and Design & Build Forms of Contract.
-
NEC3/4 Options A and C Forms of Contract.
-
Delay Analysis Techniques.
Further Information
Please contact Frances Sawicki at the address below or, alternatively, please e-mail frances.sawicki@ramskillmartin.co.uk
Head Office:
The Annexe
260 Ecclesall Road South
Sheffield
South Yorkshire
S11 9PS
Tel: 0114 230 1329