The construction industry continues to provide us with a challenging and changing working environment. We also face the real life issues arising out of the scarcity of technical and professional resources. Options 4 Training provides solutions for developing personnel and project teams.

  • Targeted Coaching for specific issues or projects.

  • Delivered by a facilitator to either an individual or a small group (up to around 5 delegates).

  • Surgery Coaching is usually delivered with no or very little preparation by the Coach, however, real life issues are resolved at the time.

  • The Surgery will ordinarily range from 2 to 8 hours dependent on the Client’s requirements and it ensures the delegates are coached at a detailed level.

  • Drafting Letters.

  • Contractual Advice.

  • Preparing Variations or Compensation Events.

  • Preparing or Amending Programmes.

  • Clarification of Contractual Mechanisms.

  • Targeted at providing a general understanding on a relatively broad subject.

  • Delivered by 2 facilitators to a maximum audience of 25 delegates.

  • Formal Seminars are delivered with PowerPoint slides and other technical handouts.

  • The Seminar will usually range from 0.5 days to 2 full days dependent on the Client’s requirements and the extent of the subject matter.

  • Commercial Awareness Training.

  • JCT 2011 and 2016 Traditional and Design & Build Forms of Contract.

  • NEC3/4 Options A and C Forms of Contract.

  • Delay Analysis Techniques.

  • Targeted at key business critical technical areas with Coaching to provide an intermediate level of technical competence.

  • Delivered by 2 facilitators to a maximum audience of 25 delegates split into sub-teams of 3 to 5 delegates.

  • A mixture of PowerPoint slides covering the general understanding and Case Study Workshops is a very effective means for delivery.

  • Workshop Coaching will ordinarily range from a single day to 2 days dependent on the extent and depth of the technical content.

  • Commercial Awareness Training.

  • JCT 2011 and 2016 Traditional and Design & Build Forms of Contract.

  • NEC3/4 Options A and C Forms of Contract.

  • Delay Analysis Techniques.

  • Targeted at key business critical technical areas with Coaching to provide a high level of technical competence.

  • Delivered by 2 or more facilitators to a maximum audience of 25 delegates split into sub-teams of 3 to 5 delegates.

  • The Case Studies are an effective means to meet our Client’s precise business requirements supported with a few selected PowerPoint slides and handouts.

  • Case Study Coaching will ordinarily range from a single day to 2 days dependent on the extent and depth of the technical content.

  • Commercial Awareness Training.

  • JCT 2011 and 2016 Traditional and Design & Build Forms of Contract.

  • NEC3/4 Options A and C Forms of Contract.

  • Delay Analysis Techniques.

Please contact Frances Sawicki at the address below or, alternatively, please e-mail frances.sawicki@ramskillmartin.co.uk

Head Office:
The Annexe
260 Ecclesall Road South
Sheffield
South Yorkshire
S11 9PS


Tel: 0114 230 1329